Water damage · InspectCam™ Pro, on Google Play

Water damage jobs, documented from the first visit to dry

Pro keeps the photos, videos and report for a water loss in one job, with notes on photos and the stamp.

A worker in a safety vest and gloves tears wet drywall off a basement wall after a flood; pink insulation and drywall pieces lie on the concrete floor, and a waterline stain runs along the bottom of the wall on the right.
Wet drywall coming out after a basement flood. Photo: Andrea Booher / FEMA, public domain, cropped
Get it on Google PlayDownload on the App StoreFree on Google Play and the App Store. Pro is on Android for now: try it free for 30 days.

By , developer of InspectCam™ · Published · Last updated

InspectCam™ Pro keeps the photos and videos of a water loss in one job on your Android phone. One tap turns the job into a PDF report under your company's name, or a link for the adjuster. The date, time and place go in one line along the bottom of each photo and video you take into the job, and each photo takes a typed note and numbered arrows. The customer signs on your phone, and the signed forms stay in the job. Coming soon: the Restoration template's shot list, the claim details, a drying log that works out grains per pound and dew point from the readings you type, and an equipment log that totals equipment-days, in the same job. Pro is on sale inside InspectCam™ on Google Play, the free camera that keeps the light on.

A water job is judged on its file. The adjuster wants to know what failed and when, how much got wet, that someone read the structure every day until it was dry, and how long each dehumidifier and air mover stayed. Too often that file is a clipboard moisture sheet, a camera roll and photos stuck in text messages, and someone has to reconstruct job details from memory at the end. Pro keeps the photos in one job as you go.

1234 Day 1the source,wet rooms Days 1–5meter on thewet material Dryafter-dryingphotos Reportone PDF tothe adjuster
One water job in Pro, from the first knock to the adjuster's inbox. The sample job on this page is a leaking valve under a kitchen sink, found on 28 September and dry on day 5.

Day one: the source, in one job

Start the job with the client and the address on one card, and put it on the camera's job chip: every photo and video you take goes into it. Every field is optional, and anything left blank simply doesn't print. Coming soon: start it from the ready-made Restoration template, and begin with the two shots the template requires, the front of the property and where the water came from.

The Restoration template switches on two documents for the customer to sign, a work authorization and a certificate of completion. Coming soon: it also switches on the rest of what a water loss needs beyond the photos: claim details, a floor plan, a drying log and an equipment log.

InspectCam Pro's Claim details page for a sample water job: claim number CLM-2026-04187, insurance company Sample Mutual, date of loss Sep 28, 2026, cause of loss with Water chosen among Water, Hail, Wind, Fire, Smoke, Mold, Storm and Other, what failed: Valve under the kitchen sink, and the water category choices with Category 1, Clean water picked, and a Done button.
Coming soonThe claim card on a sample job, from the top; the water category and class and the adjuster are further down. The claim number, insurer and date of loss go on the report’s cover; every detail prints on the job details page. Sample claim and insurer. Background photo: Andrea Booher / FEMA, public domain, blurred. Phone frame: Android Studio device art, Apache 2.0.

Coming soon: the claim card takes the claim number, insurer, date of loss, cause (water, hail, wind, fire, smoke, mold, storm, or one you type), what failed, the water category and class, and the adjuster's name, phone and email. When the adjuster calls back weeks later, search the jobs list by claim number.

Before the first air mover goes down, hand the phone to the owner to sign the work authorization with a finger. It uses a plain default wording, with the job's address filled in: remove the water and wet materials that can't be dried, dry the building and check it daily, repairs not included; the owner agrees not to move or turn off the drying equipment without asking you, and to pay for the work, including anything insurance doesn't. Your company name is a blank you fill in once per job. The job keeps the words exactly as signed, with the signer's name, the date, the time and the time zone. Coming soon: your company's own wording in place of the default, and editing it later never changes a document already signed.

The seven photos a water job needs

A wall with its lower drywall cut away in a straight line, showing the wood studs and paneling behind it, the removed piece of drywall at the edge of the frame and a box fan on the floor beyond.
Coming soonOne of the template's shots on a real water loss: Removed materials, a flood cut with the wet drywall taken off below the line. Photo: Marvin Nauman / FEMA, public domain, via Wikimedia Commons, cropped

A ready-made template's shots are yours to change: rename them, require more, or write your own tips, and the job page keeps a “Still needed” list until they're done. Coming soon: the Restoration template comes with a shot list; two shots are required out of the box, and the rest are reminders.

The Restoration template's photos, as built (coming soon)
PhotoTip in the appRequired
Front of propertyShow the house numberYes
Where the water came fromWhat failed: pipe, water heater, roof…Yes
Affected rooms—No
Moisture readingsMeter on the wet materialNo
Equipment set up—No
Removed materials—No
After dryingMeter on the dried materialNo

Each visit, photograph the meter on the wet material. Type a note under each photo. Pro stamps the photos and videos taken into the job with the date, time, street address and GPS position the phone reports, in one thin line along the bottom. Coming soon: with location off, just the date and time. What a stamp shows, and what it can't prove, is on the timestamp camera app page. Tap the small EDIT thumbnail right after a shot to add a numbered arrow or circle and say what it marks. You can also hold Talk to record a voice note with the photo, and play it back in the app. Coming soon: the template's Moisture readings and After drying shots are there for the meter.

Give each photo one or more categories, such as Kitchen or Hallway, for one photo or a whole selection at once; tap a category on the job page to see just its photos, and the report prints each room's photos under its own heading.

A page of a sample Pro report under the heading Where the water came from: a photo of a chrome shut-off valve under a kitchen sink, green corrosion around its fittings and copper lines running up to the faucet and down to the dishwasher, a yellow arrow numbered 1 pointing at the valve body and a thin stamp along the bottom with the date, time, address and GPS position. Below: Photo 2, captured Sep 28, 2026, 4:02 PM, the note Hot-water valve under the kitchen sink, and 1, leak at the valve body.
A required shot (coming soon) as the report prints it: the stamp along the bottom and the mark, with what it means. Sample address and note. Photo: “Kitchen renovation leaky valve beneath kitchen sink” by Tomwsulcer, CC0, via Wikimedia Commons, stamp and mark added

Coming soon: photos from your phone's gallery can go into the job, such as the homeowner's photos from before you arrived, once they're on your phone. They're marked “Added from phone gallery” and unstamped, so nobody mistakes them for yours.

Ask the homeowner for photos. Before you drive out, send the homeowner a link from the job. They send photos of the leak or the stained ceiling from their browser, with no app and no sign-in, and see only their own uploads. Their photos show as “From the customer” in the job and in the report. On every Pro plan, Duo included.

Since the source is usually somewhere dark, InspectCam™, free on Google Play and the App Store, keeps the light on once you tap it: you see what you're aiming at without a flashlight in your other hand. For the owner who calls before you get there, the shots to take first are in how to document water damage for an insurance claim.

Daily readings, with the math done (coming soon)

InspectCam Pro's readings page for day 2, Sep 29, scrolled to the kitchen: heating or cooling On; kitchen air 76 °F and 52% RH, worked out as 70 gr/lb and a dew point of 57 °F; moisture point M1, drywall on the sink wall 12 in up, reading 58 with a goal of 12; M2, wood subfloor at the dishwasher, 21 with a goal of 13 percent; DH1's outlet at 95 °F and 20% RH, 49 gr/lb, dew point 48 °F and a grain depression of 21; and the day's note.
Coming soonOne day’s readings on the sample job, scrolled to the kitchen. You type the temperatures, humidity and meter readings; the amber lines are worked out. The numbers were checked against the app’s formula, at sea level. Background photo: Marvin Nauman / FEMA, public domain, via Wikimedia Commons, blurred. Phone frame: Android Studio device art, Apache 2.0.

Coming soon: set up each wet room once: its name, its size, and the moisture points you'll read, each with its material, where it is, and a dry standard from the same material in a room that stayed dry. A point counts as dry at or below its goal, which is the dry standard unless you set one. Above about 2,000 feet, enter the elevation; grains per pound depend on it.

Coming soon: after that, each visit is one page: outside, a dry area, each room's air, each point, each dehumidifier's outlet, and a note. Type the temperature and relative humidity; grains per pound and dew point appear beside them. An outlet reading gives that unit's grain depression, so you can tell on site, not at invoice review, when a dehumidifier stops pulling its weight.

100500 Kitchen · drywall, sink wall, 12 in up Meter’s own scale · one reading a day goal 12 No readings ✓ Dry on day 5 Day 1Day 2Day 3Day 4Day 5 92583111
Coming soonThe log keeps score: when each point reaches its goal, the day each room was dry and how many days it took, and the day nobody read a room that was still drying. Sample readings.

Coming soon: the job page shows when each room and the whole job reached dry, and how many days it took. A day when a room that was still drying went unread is flagged, and the report prints it as “No readings” rather than skipping it, so you spot the gap before the adjuster does. Readings are typed in by hand, in Fahrenheit; nothing connects to a meter.

Equipment in, equipment out (coming soon)

Equipment log Equipment-days = units × whole 24-hour periods on site, rounded up 9/289/299/3010/110/2 DH1 · LGRAir movers ×2Air mover ×1Air mover, axial KitchenKitchenKitchenHallway 4442 Dehumidifier 4 · air movers 10 · total 14 equipment-days
Coming soonThe sample job's equipment as a timeline; the number at the end of each bar is its equipment-days. In the report the same log prints as a table with placed and removed times, hours, and totals by type. Photo: Ser Amantio di Nicolao, CC0, via Wikimedia Commons, cropped

Coming soon: log equipment as you set it: a dehumidifier (LGR, conventional or desiccant), an air mover (centrifugal or axial), an air scrubber, a heater or anything else, with how many, which room, make and model, size, and when it was placed. Each dehumidifier gets its own line, so its outlet readings stay with it. When units come out, “Remove from site” asks how many and when.

Coming soon: equipment-days follow one rule every time: units × whole 24-hour periods on site, rounded up, never less than one, with the hours beside them. Units still on site count to the report's date. The report adds totals by type, units on site each day, and any equipment left in a room after it read dry, with that day's notes. Nothing connects to an estimating program; you carry the totals over yourself, with the log behind them.

What the adjuster gets back

Two pages of a sample water mitigation report. Left, the cover: Kitchen water loss, 2210 Sample St, Springfield, IL, the claim line with CLM-2026-04187, Sample Mutual and the date of loss Sep 28, 2026, the report number SC-2026-0057 and the job notes. Right, the first drying log page: the days read, with day 4 printed as No readings, the kitchen dry in 5 days, its air day by day with grains per pound and dew point, and the two moisture points with ticks at the goal on day 5.
Coming soonThe cover and the first drying log page of a sample report. Sample company, claim and readings; the gr/lb and dew point columns follow the app’s formula.

One tap builds the report with your company's name on it, and a permanent report number that doubles as the file name. On a water job it runs in this order:

  1. The cover, with the claim number, insurer and date of loss (coming soon).
  2. Job details, with every claim detail (coming soon).
  3. Before-and-after pairs, a page each.
  4. The photos, each with its date and time, and its note, stamp and numbered arrows, grouped by room.
  5. The floor plan: a picture prints whole, a PDF its first page, marked “Page 1 of N shown”. There's no drawing tool, so photograph the sketch or attach the plan (coming soon).
  6. The drying log: tables, a chart per room, each dehumidifier's grain depression (coming soon).
  7. The equipment log and its totals (coming soon).
  8. The signed work authorization and certificate of completion, a page each.
  9. Your closing page (coming soon), and one small “Generated with InspectCam” line on the last page.

Preview before you send and pick US Letter or A4. Make a summary-only version too, with no photo pages. On a company job you can also send the adjuster a link instead of a file: it opens the report in their browser, with Download PDF. Stop sharing takes the link down. A photo or video you mark internal only never reaches the report or the link. The same goes for a finding, though its photos still print under “Other photos” unless you mark them internal too. Coming soon: what you mark internal stays with your team.

When the last room reads dry and the equipment is out, the owner signs the certificate of completion on your phone. The app records the signing. Whether it binds anyone isn't something an app can tell you; ask your own lawyer.

If you're the adjuster

An aerial photo of a one-story house with a gray roof, a driveway on the left, a patio on the right and a shed in the back yard, with numbered labels: 1, front, from the street; 2, right side; 3, back; 4, left side; 5, roof slopes; 6 to 8, damage overview, close-up and inside; 9, other buildings, on the shed.
Coming soonThe Insurance adjuster template’s nine photos as a walk-around of a real lot, labels added. The tips say to show the house number at the front and to take each roof slope. Photo: Paragon Exterior / Unsplash, labels added

Coming soon: the ready-made Insurance adjuster template is built for the inspection rather than the drying. It lays out the walk-around above: the front with the house number showing (required), each side, the back, every roof slope, a damage overview and close-up, inside damage, and other buildings on the lot. Coming soon: it also turns on the claim card and findings.

A finding card from a sample inspection-style report under 3 · Interior: Comment 3.1, severity Repair, Ceiling stain, hall bath; Location: below the upstairs bath; a photo of a stained ceiling tile with a red circle numbered 1 and a stamp along the bottom, captioned Figure 3-1, captured Oct 2, 2026, 9:12 AM, with 1, stained tile, still damp; then Observed, Implication and Recommendation.
One finding card from a sample inspection-style report: the comment number and severity, the location, the photo as a numbered figure with its capture time, then what was observed, what it means and what to do. Sample text. Photo: “Ceiling water damage” by Atomicdragon136, CC BY 3.0, via Wikimedia Commons, cropped, stamp and mark added

Group the photos into findings, each with a title, a severity, a location, what you saw, what it means and a recommendation. The report then prints as an inspection: a cover, then a findings summary, a contents page and one card per finding with its figures numbered; photos in no finding print under “Other photos”. Coming soon: the claim on the cover.

One tech or a few crews

Duo adds one tech, Team holds 5 people and Business 10. On Team and Business, the plumber who replaced the valve can send photos of the repair from their phone's browser, by link (QR codes coming soon), with no app and no account. Coming soon: the plan's owner brings techs in with a short invite code, and every phone on a company job shows the same photos and notes; changes merge field by field, so the tech who shot the kitchen in the morning and the one who shot the basement in the afternoon both keep their work. Coming soon: the claim, the logs and the signed forms sync the same way, so the tech who read the kitchen and the one who read the basement both keep their readings. For now, each person on your crew needs an Android phone. On iPhone: the free camera is on the App Store.

Every plan has the report, notes on photos, the stamp, the templates and signatures. Coming soon: the claim card and both logs, on every plan. There's no one-person plan: if you work alone, Duo leaves room for a helper. Duo, up to 2 people, US$39.99 a month; Team, up to 5 people, US$89.99 a month; Business, up to 10 people, US$159.99 a month. Duo and Team: pay yearly and get a year for the price of ten months. Business is monthly only. US prices, plus any tax, charged by Google Play. In Canada and Australia, Google Play shows your own price. A company's first plan can start with a 30-day free trial. More than 10 people? Email support@inspectcam.app. The full plan comparison is on the InspectCam™ Pro page.

Which plan fits a water business
PlanPeopleFits
DuoUp to 2An independent adjuster, or an owner who runs the jobs with one helper.
TeamUp to 5A few techs and the office on the same jobs (coming soon), plus the trade photo drop for the plumber or roofer who fixed the cause.
BusinessUp to 10Several crews working several losses at once.

Questions restorers ask

Does InspectCam™ connect to my moisture meter?

No. Take the photo with the meter’s reading in view, and the reading goes into the job with the photo, its note and its stamp. Coming soon: the drying log, where you type each reading in by hand, and grains per pound and dew point are calculated from the temperature and humidity you enter, in Fahrenheit.

Can the report go straight into my estimating software or the carrier's system?

No. Pro doesn't connect to any estimating, insurer or claims system. It builds a PDF report under your company name, and you send it yourself.

Is the drying log approved by an industry standard or an insurer?

No. Coming soon: the drying log records your readings and works out grains per pound, dew point, days to dry and equipment-days from them. The water category and class choices are short summaries, not the text of any standard. Whether a log meets a carrier's guidelines is between you and the carrier.

Can the property owner sign the paperwork on my phone?

Yes, with Pro. The owner signs the work authorization and the certificate of completion with a finger. The job keeps the wording as signed with their name, the date, the time and the time zone, and each document prints on its own page.

How are equipment-days counted?

Coming soon: the equipment log counts units × whole 24-hour periods on site, rounded up, never less than one, with the hours beside them. Units still on site count up to the report's date, and the report totals them by type.

What if nobody reads a room one day?

Coming soon: the report prints that day as a “No readings” row instead of leaving it out, so you spot the gap before the adjuster does. Only a room with moisture points that hasn't reached dry can miss a day.

Can I send the adjuster a link instead of a file?

Yes, from a company job’s full report. The link opens the report in the adjuster’s browser, with Download PDF, and Stop sharing takes it down.


Pro for other trades: plumbers, electricians, HVAC techs, home inspectors, move-in and move-out inspections, contractors and their crews, mold remediation, and who InspectCam™ is for.

If your water jobs need something that isn't here, write to support@inspectcam.app.