Water damage · InspectCam Pro, coming soon

Water damage jobs, documented from the first visit to dry

By , developer of InspectCam · Published · Last updated

InspectCam Pro keeps a water loss in one job on your Android phone: the claim details, stamped photos, a drying log that works out grains per pound and dew point from the readings you type, an equipment log that totals equipment-days, and the customer's signatures. One tap turns it into a PDF report under your company name. Pro is coming soon; the free InspectCam on Google Play today is the camera with the light already on.

A water job is judged on its file. The adjuster wants to know what failed and when, how much got wet, that someone read the structure every day until it was dry, and how long each dehumidifier and air mover stayed. Too often that file is a clipboard moisture sheet, a camera roll and a text thread, stitched together at the end. Pro builds it as you go.

1234 Day 1claim, source,authorization Days 1–5readings andequipment Drycompletionsigned Reportone PDF tothe adjuster
One water job in Pro, from the first knock to the adjuster's inbox. The sample job on this page is a kitchen sink drain that leaked on 28 September and was dry on day 5.

Day one: the claim, the source, the signature

Start the job from the ready-made Restoration template and it switches on what a water loss needs: claim details, a floor plan, a drying log, an equipment log, and two documents for the customer to sign. Fill in what you know at the door. Every field is optional, and anything left blank simply doesn't print.

9:05 Claim details All optional. What you add prints in the report. CLAIM NUMBERINSURANCE COMPANYDATE OF LOSSCAUSE OF LOSS WHAT FAILEDWATER CATEGORYWATER CLASSADJUSTER CLM-2026-04187Sample Mutual09/28/2026Kitchen sink drain Water FireSmokeMoldStormOther Category 2 · Gray waterClass 2 5 to 40% of the floor, walls and ceiling wet Pat Sample · (555) 010-0142 pat.sample@example.com Done
Illustration The claim card on a sample job. The claim number, insurer and date of loss go on the report's cover; every detail prints on the job details page. Sample claim, insurer and adjuster.

The claim card takes the claim number, insurer, date of loss, cause (water, fire, smoke, mold, storm, or one you type), what failed, the water category and class, and the adjuster's name, phone and email. When the adjuster calls back weeks later, search the jobs list by claim number.

Before the first air mover goes down, hand the phone to the owner to sign the work authorization with a finger. It uses your company's wording, or a plain default: remove the water and wet materials that can't be dried, dry the building and check it daily, repairs not included; the owner agrees not to move or turn off the drying equipment without asking you, and to pay for the work, including anything insurance doesn't. The job keeps the words exactly as signed, with the signer's name, the date, the time and the time zone.

The seven photos a water job needs

A finished basement hallway after a water loss, seen from the stairs: green air movers on the carpet, a dehumidifier further down the hall, and extension cords running along the floor.A wall with its lower drywall cut away in a straight line, showing the wood studs and paneling behind it, the removed piece of drywall at the edge of the frame and a box fan on the floor beyond.
Two of the template's shots on real water losses: Equipment set up, with air movers and a dehumidifier drying a basement (left), and Removed materials, a flood cut with the wet drywall taken off (right). Photos: left, “Windy basement” by Andrew Magill, CC BY 2.0, via Flickr, cropped; right, Marvin Nauman / FEMA, public domain, via Wikimedia Commons, cropped

The Restoration template comes with a shot list. Two shots are required out of the box; the rest are reminders. Rename them, require more, or write your own tips, and the job page keeps a “Still needed” list until they're done.

The Restoration template's photos, as built
PhotoTip in the appRequired
Front of propertyShow the house numberYes
Where the water came fromWhat failed: pipe, water heater, roof…Yes
Affected rooms—No
Moisture readingsMeter on the wet materialNo
Equipment set up—No
Removed materials—No
After dryingMeter on the dried materialNo

Every photo taken into the job is stamped with the date, time, street address and GPS position the phone reports, in one thin line along the bottom; with location off, just the date and time. Tap the small EDIT thumbnail right after a shot to add a numbered arrow or circle and say what it points at. Give each photo one or more categories, such as Kitchen or Hallway, for one photo or a whole selection at once; tap a category on the job page to see just its photos, and the report prints each room's photos under its own heading.

1 09/28/2026 · 4:02 PM · 2210 Sample Dr · 39.7990, −89.6440 Where the water came from Required 1 Leak at the trap slip nut Tip: What failed: pipe, water heater, roof…
Illustration A required shot, stamped and marked. The stamp is drawn larger than it is on a real photo; the address is a sample, and the phone shortens a long one to fit. Photo: “Leaking PVC Pipe Under Sink - P Trap” by Tony Webster, CC BY 2.0, via Wikimedia Commons, cropped, marks added

The homeowner's own photos from before you arrived can come in from the phone's gallery, labeled as such and unstamped, so nobody mistakes them for yours. And since the source is usually somewhere dark, InspectCam, free on Google Play, opens with the light already on: you see what you're aiming at without a flashlight in your other hand.

Daily readings, with the math done

9:05 Day 2 · 09/29/2026 OUTSIDEDRY AREAKITCHEN · AIRMOISTURE POINTSDH1 OUTLET 84 °FRH 71% 70 °FRH 46% 76 °FRH 52% 95 °FRH 20% 125 gr/lb · dew point 74 °F 50 gr/lb · dew point 48 °F 70 gr/lb · dew point 57 °F 49 gr/lb · grain depression 21 12 Drywall · sink wall, 12 in upWood subfloor · dishwasher goal 12, meter scalegoal 13% 5821% Done
Illustration One day's readings on the sample job. You type the temperatures, humidity and meter readings; the amber lines are worked out. The numbers were checked against the app's formula, at sea level.

Set up each wet room once: its name, its size, and the moisture points you'll read, each with its material, where it is, and a dry standard from the same material in a room that stayed dry. A point counts as dry at or below its goal, which is the dry standard unless you set one. Above about 2,000 feet, enter the elevation; grains per pound depend on it.

After that, each visit is one page: outside, a dry area, each room's air, each point, each dehumidifier's outlet, and a note. Type the temperature and relative humidity; grains per pound and dew point appear beside them. An outlet reading gives that unit's grain depression, so you can tell on site, not at invoice review, when a dehumidifier stops pulling its weight.

100500 Kitchen · drywall, sink wall, 12 in up Meter’s own scale · one reading a day goal 12 No readings ✓ Dry on day 5 Day 1Day 2Day 3Day 4Day 5 92583111
The log keeps score: when each point reaches its goal, the day each room was dry and how many days it took, and the day nobody read a room that was still drying. Sample readings.

The job page shows when each room and the whole job reached dry, and how many days it took. A day when a room that was still drying went unread is flagged, and the report prints it as “No readings” rather than skipping it, so you spot the gap before the adjuster does. Readings are typed in by hand, in Fahrenheit; nothing connects to a meter.

Equipment in, equipment out

Equipment log Equipment-days = units × whole 24-hour periods on site, rounded up 9/289/299/3010/110/2 DH1 · LGRAir movers ×2Air mover ×1Air mover, axial KitchenKitchenKitchenHallway 4442 Dehumidifier 4 · air movers 10 · total 14 equipment-days
Illustration The sample job's equipment as a timeline; the number at the end of each bar is its equipment-days. In the report the same log prints as a table with placed and removed times, hours, and totals by type. Photo: Ser Amantio di Nicolao, CC0, via Wikimedia Commons, cropped

Log equipment as you set it: a dehumidifier (LGR, conventional or desiccant), an air mover (centrifugal or axial), an air scrubber, a heater or anything else, with how many, which room, make and model, size, and when it was placed. Each dehumidifier gets its own line, so its outlet readings stay with it. When units come out, “Remove from site” asks how many and when.

Equipment-days follow one rule every time: units × whole 24-hour periods on site, rounded up, never less than one, with the hours beside them. Units still on site count to the report's date. The report adds totals by type, units on site each day, and any equipment left in a room after it read dry, with that day's notes. Nothing connects to an estimating program; you carry the totals over yourself, with the log behind them.

What the adjuster gets back

SC Sample Co. Restoration Water mitigationreport 2210 Sample DrSpringfield, IL Claim CLM-2026-04187Sample MutualDate of loss 09/28/2026 Report no. SC-2026-0057 SC-2026-0057 · Drying log Kitchen Dry in 5 days (9/28 to 10/2) Day°FRHgr/lbDew 17863%9064 27652%7057 37441%5149 4No readings 57240%4746 Drywall, sink wall Sample Co.Page 6 of 11
Illustration The cover and a drying log page of a sample report. Sample company, claim and readings; the gr/lb and dew point columns follow the app's formula.

One tap builds the report with your company's name, logo, contact details and license on it, and a permanent report number that doubles as the file name. On a water job it runs in this order:

  1. The cover, with the claim number, insurer and date of loss.
  2. Job details, with every claim detail.
  3. Photos by room, each with its stamp, note and marks; before-and-after pairs get a page each.
  4. The floor plan: a picture prints whole, a PDF its first page, marked “Page 1 of N shown”. There's no drawing tool, so photograph the sketch or attach the plan.
  5. The drying log: tables, a chart per room, each dehumidifier's grain depression.
  6. The equipment log and its totals.
  7. The signed work authorization and certificate of completion, a page each.
  8. Your closing page, with one small “Generated with InspectCam” line.

Preview before you send, make a summary-only version, and pick US Letter or A4. On a company job you can also send the adjuster a link instead of a file: it opens the report's photos in their browser, with Download PDF for the whole report, logs included. Stop sharing takes the link down. A photo, video or finding you mark internal only stays with your team and never reaches the report. When the last room reads dry and the equipment is out, the owner signs the certificate of completion on your phone. The app records the signing. Whether it binds anyone isn't something an app can tell you; ask your own lawyer.

If you're the adjuster

Shed Inside STREET 1234 5 678 9 1 Front of property2 Right side3 Back4 Left side5 Roof slopes 6 Damage overview7 Damage close-up8 Inside damage9 Other buildings 1 is required by default
The Insurance adjuster template's nine photos as a walk-around of a sample lot. The tips say to show the house number at the front and to take each roof slope.

The ready-made Insurance adjuster template is built for the inspection rather than the drying. It turns on the claim card and findings, and lays out the walk-around above: the front with the house number showing (required), each side, the back, every roof slope, a damage overview and close-up, inside damage, and other buildings on the lot.

COMMENT 3.1 REPAIR Ceiling stain, hall bath Location: Below the upstairs bath 1 Figure 3-1 · Captured Oct 2, 2026, 9:12 AM 1 Stained tile, still damp OBSERVEDIMPLICATIONRECOMMENDATION Stained tile below the upstairs bath, still damp.Water from above; the source is not found yet.Open the ceiling and check the upstairs drain line.
Illustration One finding card from a sample inspection-style report: the comment number and severity, the location, the photo as a numbered figure with its capture time, then what was observed, what it means and what to do. Sample text. Photo: “Ceiling water damage” by Atomicdragon136, CC BY 3.0, via Wikimedia Commons, cropped, marks added

Group the photos into findings, each with a title, a severity, a location, what you saw, what it means and a recommendation. The report then prints as an inspection: a cover with the claim, then a findings summary, a contents page, one card per finding with its figures numbered, and a page on scope and limitations.

One tech or a few crews

Duoup to 2 Teamup to 5+ trade photo drop Businessup to 10+ trade photo drop
The plans differ by how many people share the company account, and Team and Business add the trade photo drop. Every plan has the claim card, both logs, signatures and the report.

The plan's owner brings techs in with a short invite code: Duo adds one tech, Team holds 5 people and Business 10. Every phone on a company job shows the same claim, photos, logs and signed forms. Changes merge field by field, so the tech who read the kitchen in the morning and the one who read the basement in the afternoon both keep their readings. On Team and Business, the plumber who repaired the drain can send photos of the repair from their phone's browser, by QR code or link, with no app and no account. For now, each person on your crew needs an Android phone; the iPhone app is coming soon, with Pro included.

There's no one-person plan: if you work alone, Duo leaves room for a helper. For 11 or more people, ask us about a custom plan. The full plan comparison is on the InspectCam Pro page.

Which plan fits a water business
PlanPeopleFits
DuoUp to 2An independent adjuster, or an owner who runs the jobs with one helper.
TeamUp to 5A few techs and the office on the same claims, plus the trade photo drop for the plumber or roofer who fixed the cause.
BusinessUp to 10Several crews working several losses at once.

Questions restorers ask

Does InspectCam connect to my moisture meter?

No. You type each reading in by hand, and grains per pound and dew point are calculated from the temperature and humidity you enter. Temperatures are in Fahrenheit.

Can the report go straight into my estimating software or the carrier's system?

No. Pro doesn't connect to any estimating, insurer or claims system. It builds a PDF report under your company name, and you send it yourself.

Is the drying log approved by an industry standard or an insurer?

No. It records your readings and works out grains per pound, dew point, days to dry and equipment-days from them. The water category and class choices are short summaries, not the text of any standard. Whether a log meets a carrier's guidelines is between you and the carrier.

Can the property owner sign the paperwork on my phone?

Yes, with Pro. The owner signs the work authorization and the certificate of completion with a finger. The job keeps the wording as signed with their name, the date, the time and the time zone, and each document prints on its own page.

How are equipment-days counted?

Units × whole 24-hour periods on site, rounded up, never less than one, with the hours beside them. Units still on site count up to the report's date, and the report totals them by type.

What if nobody reads a room one day?

The report prints that day as a “No readings” row instead of leaving it out, so you spot the gap before the adjuster does. Only a room with moisture points that hasn't reached dry can miss a day.


Pro for other trades: home inspectors, move-in and move-out inspections, contractors and their crews, and who InspectCam is for.

Nothing on this page is for sale yet, and the details may still shift before Pro launches. If your water jobs need something that isn't here, write to support@inspectcam.app.